As soon as it’s done, PSE&G or NJ American will rip it up for “unplanned” repairs.
since the topic is repaving, here's a story from the midwest. I'm in northern MI at the moment (Harrisville, to be exact). On Saturday we drove up to Alpena on US Route 23. We hit a stretch that was being repaved. Must have been at least 5 miles long, maybe longer. The northbound side was milled, southbound had not been touched yet.
Anyway, it was pretty obvious from looking at the sb side that this road in no way needed to be repaved. It was in perfect shape. Not a crack or pothole in sight.
Pissed me off. What a waste of money. And as I said, it was a several mile stretch so it wasn't a trivial project.
here we go. 12.2 miles and 3.8 million
end of rant.
drummerboy said:
since the topic is repaving, here's a story from the midwest. I'm in northern MI at the moment (Harrisville, to be exact). On Saturday we drove up to Alpena on US Route 23. We hit a stretch that was being repaved. Must have been at least 5 miles long, maybe longer. The northbound side was milled, southbound had not been touched yet.
Anyway, it was pretty obvious from looking at the sb side that this road in no way needed to be repaved. It was in perfect shape. Not a crack or pothole in sight.
Pissed me off. What a waste of money. And as I said, it was a several mile stretch so it wasn't a trivial project.
here we go. 12.2 miles and 3.8 million
end of rant.
Maybe they’re doing the repaving before the road gets bad? Like replacing the roof before it leaks?
mrincredible said:
Maybe they’re doing the repaving before the road gets bad? Like replacing the roof before it leaks?
maybe. is that a thing though?
drummerboy said:
mrincredible said:
Maybe they’re doing the repaving before the road gets bad? Like replacing the roof before it leaks?
maybe. is that a thing though?
It is, at least, in the Philippines.
Also, from the Michigan DOT press release:
“The work will extend the pavement service life.”
Rudy's General Contractor & Construction LLC
Jun 12, 2026 at 11:25pm
Jun 12, 2026 at 7:07pm
Jun 9, 2026 at 7:37pm
Reliable Spanish Speaking Nanny
Jun 9, 2026 at 8:52am
If you want your house sparkling for weeks ...please call me...9739917600
Jun 8, 2026 at 9:06pm
Jun 8, 2026 at 8:31pm
Jun 6, 2026 at 9:54am
Jun 4, 2026 at 5:47pm
In home newborn education/postpartum support
Jun 1, 2026 at 10:14pm
Jun 1, 2026 at 4:32pm
Afterschool nanny needed in August Basking Ridge
Jun 12, 2026 at 4:59pm
SOF616 South Orange Village Part Time Nanny for one child age 4-07079
Jun 12, 2026 at 9:06am
WOF508 West Orange Part Time Nanny for one child age 6 07052
Jun 12, 2026 at 8:58am
WF906 Watchung Full Time Nanny for one child age 4 Months 07069
Jun 11, 2026 at 8:32am
NCF506 North Caldwell Part Time Nanny for two children ages 8 and 6
Jun 9, 2026 at 11:16am
PPF602 Palisades Park Part Time Nanny for one child age 1 07650
Jun 9, 2026 at 11:16am
NCF505 North Caldwell Full Time Summer Nanny for two children ages 8 and 6
Jun 9, 2026 at 11:16am
ASAP- NANNY/HOUSEKEEPER NEEDED- CHATHAM, NJ
Jun 6, 2026 at 5:08pm
Jun 1, 2026 at 5:53pm
Full-Time Nanny in South Orange, NJ
Jun 1, 2026 at 10:19am

First let me say how happy I am that major roads around here are getting milled and repaved. There’s been so much patchwork to temporarily fix the poor condition of some of our thoroughfares. It’s great to see a much more permanent fix happening.
But oh my stars and garters! It seems like every time I turn a corner I find myself on a milled surface going 10 mph trying to avoid destroying a tire on a utility cover! I know it will be over soon but I think I want to just stay home until it’s done.